Monday, February 21, 2011

> Introduction

By :Taufiqullah Neutron (Masteropik)

Building homes, both modest home, the home medium,
as well as luxury homes, homes to live alone or as an investment
in the future as well as properties of public consumption costs
is not small. For that, the necessary calculations
carefully, both the total cost of manufacture, the volume of work, and type
employment, material prices, wage workers, and plan and working conditions.

It is intended that the cost of making efficient homes and
measured in accordance with the plan drawings. In building construction
building, it is called the Budget Plan (RAB)
usually disetalikan with the Work Plan and Technical Conditions (RKS).

Some advantages when we first
calculate the cost of the house are as follows;
1. What type of work that will be used for
held / purchased.

2. The volume of the various materials that will be required in
make a home can be known.

3. Total costs required to manufacture the house
can be estimated that the financial turnaround can be arranged.

4. Owners can be helped in negotiating about the price bid
contractor or the second (if a job making house
will be done to others) so it will not harm
owner as the first party.

5. Any jobs already or who have not completed
done (if done the second / other people) can be controlled.
Knowledge of the RAB and RKS in job
manufacture of building / houses would be
beneficial, because it will make it easier to understand many things
associated with the development, among others, understand
equipment to be used in building, building materials,
material requirements, power requirements, processing time (execution).

The existence of this understanding will berdamapak on knowledge
regarding funding needs, material requirements, control, and
uses in the every stage of work.

The basis of the RAB and the RKS is understanding image
planning, so that it can count the number and type of building materials
which will be purchased for development. In terms of building this
known as the volume of work. Volume is the number of sorts
work or materials with different units, depending
needs in every kind of work performed. Volume
referred to in the form of unit length (m1), area (m2), content (m3),
fruit (bh), the unit, not yet sum (Ls). While the price of building materials and
worker wage rates vary, depending on the place and time
home-making.




back to top